Outstanding Balance 
Labour : £1300.00
Materials: £48.59

WEEK 1

Completed Work:

          • Demolition of partition walls – dismantling of 2 plasterboard (GK) walls, with the frame of one wall left intact to support the ceiling and allow further assessment of the condition of the ceiling/floor beams.
          • Removal of all doors and door frames – removal of door leaves and casings.
          • Dismantling and disposal of bathroom fixtures – removal of bathtub, toilet, and washbasin including fittings, siphons, and drains.
          • Securing the water installation – temporary capping and marking of cold and hot water pipes.
          • Opening the floor – removal of floorboards in the installation zone to expose and prepare for future pipe routing.
          • Dismantling the bathroom ceiling – removal of plasterboard ceiling to check for level differences in the ceiling structure.
          • Preliminary diagnostics of blocked drain – locating and initial assessment of a clogged sewage pipe.
          • Attempt to uncover the external drain pipe – trial excavation to locate the building’s sewage connection.
          • Ceiling removal along external wall – removing a strip of ceiling approx. 0.8 m wide along the external wall to assess the condition of the joists.
          • Assessment of electrical wiring – uncovering wires and conducting a preliminary evaluation of the electrical system.
          • Dismantling the old heating boiler – disconnecting and removing the unit.
          • Removal of wallpaper in the living room – stripping wallpaper from all walls; ceiling left for assessment to determine whether full removal is necessary.

🧱 Materials:

          • Wickes 48.59

📸 Photos:

🔮 Plans for Week 2

        • Item 1
        • Item 2
        • Item 3